Apartment make-ready: the unit turnover checklist, in the right order

Move-out on Friday, new tenant on Monday. Here is the order that gets a unit rent-ready fast.

  • Free to post
  • Only verified pros bid
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

The last resident moved out Friday. The next one gets the keys Monday. And the bedroom is purple. Every day a unit sits empty is a day without rent, so a good make-ready is about doing the right things in the right order, with the trades lined up back to back. This guide gives you the apartment make-ready checklist, the order of work that saves the most time, how to cut vacant days, and how to get bids for one unit or a whole building.

The right order of work

  1. Inspect on move-out day with photos of every room, and list everything that needs work.
  2. Order materials right away: paint, flooring, blinds, appliance parts.
  3. Repairs first: drywall, doors, fixtures, appliances, anything behind the finishes.
  4. Paint next: walls, trim and doors, after the patches are dry.
  5. Flooring after paint: so drips and ladders never touch the new floor.
  6. Clean last: one deep clean when the dust is done, not two.
  7. Rekey and final walk-through: new locks, test everything, final photos.
Tip: The most common time waster is cleaning too early. Book the clean after paint and flooring, and have the cleaner leave the unit ready for the final walk-through.

The make-ready checklist, room by room

AreaCheck and fix
Whole unitWall patches and paint, doors and hardware, blinds, outlet covers, light bulbs, smoke and CO alarms
KitchenAppliances working and clean, cabinet doors and drawers, faucet and drain, countertops, under the sink
BathroomsToilet, faucet and drain, caulk around the tub, grout, exhaust fan, mirror and towel bars
Bedrooms and living areasCloset doors, flooring or carpet, windows and screens, ceiling fans
SystemsHVAC filter, water heater, any leaks, thermostat
FinalDeep clean, rekey, keys and remotes counted, final photos

How to cut vacant days

  • Do the move-out inspection the same day, with the make-ready list ready to send.
  • Keep standard paint colors and flooring on hand so nothing waits on an order.
  • Book the trades back to back: repairs, paint, floors, clean.
  • Post the job as soon as you get notice to vacate, so bids are in before move-out.
  • Use the same scope every time, so pros can bid quickly and accurately.

One unit or a whole building

For a single unit, one make-ready crew can often handle repairs, paint and cleaning together. For several units or a whole building, it can make sense to have specialists for paint, flooring and cleaning working in a rotation. Post the scope either way and compare the bids.

Write your rent-ready standard once

The fastest teams do not decide the scope from scratch for every unit. They write one rent-ready standard and use it every time: the paint colors and sheen, the flooring and when it gets replaced, the blinds, light bulbs, outlet covers, smoke alarm checks and the cleaning list. Share it with every pro so bids are quick and the result is the same in every unit.

Common make-ready surprises

  • Pet damage: scratched doors, stained carpet and pad, chewed blinds.
  • Slow leaks: under the kitchen sink, behind the toilet, around the tub. Check the cabinet floors.
  • Nail holes and anchors from shelves and TVs, sometimes dozens of them.
  • Appliances that work but do not meet your standard: worn gaskets, broken shelves, missing knobs.
  • Left-behind items that need junk removal before anyone else can start.

A move-out inspection with photos catches these on day one instead of day five.

Running several units at once

When several units turn in the same week, set up a rotation: the repair crew moves to the next unit while paint starts behind them, then flooring, then cleaning. One shared schedule, and one person who walks each unit at the end, keeps the rotation from stalling. Post the units and dates together so pros can plan their crews.

What to put in your post

  • Unit size (bedrooms and baths) and how many units
  • Move-out date and the date it must be rent-ready
  • Your make-ready list from the inspection, with photos
  • Your standard paint colors and flooring, if you have them
  • Access: lockbox, office hours, parking and the building's rules for contractors

Get apartment make-ready bids on BidHandyman

Post your make-ready free, for one unit or many. Only pros approved by BidHandyman can bid. Compare the bids, message the pros and hire the ones you like, with no obligation. Post your make-ready, or see commercial property maintenance and move-out cleaning.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What is an apartment make-ready?

A make-ready is everything that gets a unit from move-out to rent-ready: inspection, repairs, paint, flooring, a deep clean and rekeying the locks, so the next resident walks into a home that looks and works like new.

What order should make-ready work go in?

Inspect first, then repairs, then paint, then flooring, then the clean, and rekey last. Cleaning before paint or flooring means cleaning twice.

How long should a unit turnover take?

Many teams aim for a few days instead of a couple of weeks. The biggest time savers are a same-day move-out inspection, ordering materials early and booking the trades back to back.

Should I rekey after every move-out?

Rekeying or changing the locks between residents is a common practice for safety and peace of mind. Check your local rules and your company policy.

Can I post several units at once?

Yes. Post a single unit, a list of units, or a whole building, with the unit sizes and the dates. Pros bid on the work they do.

Can I get one pro for the whole make-ready?

Some handyman and make-ready crews handle repairs, paint and cleaning together; others specialize. Post the whole scope and compare both kinds of bids.

What should a move-out inspection cover?

Walls and paint, floors, doors and locks, windows and blinds, appliances, plumbing fixtures, smoke and carbon monoxide alarms, and anything the last resident left behind, with photos of every room.