Home additions: plan your room addition and get bids from verified local pros

The family is growing and the house is not. Post your addition free, compare bids from local pros, and choose an experienced pro you have checked.

  • Free to post
  • Only verified pros bid?
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

Home additions: is adding on the right move?

The family is growing and the house is not. Kids share rooms, there is no office, there is no space for a parent who needs to move in, and moving is not an option. Home additions solve that by building new space onto the house you already love. Before you call anyone, write down what the new space is for, how big it needs to feel and where it could go. Also look at the space you already have: a basement, an attic or the garage can sometimes become living space with less disruption.

Types of home additions

TypeWhat it isGood to know
Bump-out additionA small extension of one room, often just a few feet.A bigger kitchen, bath or nook without a full addition. Setbacks and the roofline still apply.
Room additionA new room on its own foundation, tied into the house.Bedrooms, family rooms, offices and primary suites. Needs yard space inside your setbacks.
Second story additionBuilding up over part or all of the house.Keeps your yard. An engineer must confirm the walls and foundation can carry it. Often the largest and most disruptive kind.
Garage conversionTurning an attached garage into living space.The slab and roof are already there; the floor, insulation, windows and heating and cooling need work. Check local parking rules.
SunroomA room with walls of windows.Three-season rooms are not heated or cooled; four-season rooms are insulated and built like the rest of the house.
In-law suiteA bedroom and bath, often a small kitchen, sometimes its own entrance.Local rules vary widely on second kitchens, separate entrances and renting it out.

Zoning, setbacks, permits and plans

Zoning decides what you can build. Setbacks limit how close you can build to the property lines, and there may also be height limits, limits on how much of the lot can be covered, and easements where nothing can be built. HOAs and historic districts can add their own rules. Check with your city or county early, before you fall in love with a plan.

An addition almost always needs a building permit, with inspections at stages such as the foundation, framing, plumbing, electrical, insulation and final. Building without one can cause trouble with your insurance and when you sell.

Then come the plans. An architect or a home designer draws the layout, and an engineer often designs the structure: the foundation, the beams and, for a second story, whether the existing house can carry the load. Some areas require plans stamped by a licensed professional, so check locally. Getting every bid on the same drawings is the easiest way to compare pros.

Tip: Ask your city for the permit checklist for additions before the drawings are finished. It tells you what the plans must show and saves a round of changes.

Foundation, roof tie-in and matching the outside

  • Foundation: the new foundation is usually matched to the house: slab, crawl space or basement. Ask how the new and old foundations will meet and how the soil will be prepared. Where clay soil moves, ask how they handle it; our foundation repair guide explains why it matters.
  • Roof tie-in: where the new roof meets the old one is a common leak spot. Ask how the rooflines will connect and how the flashing will be done.
  • Matching siding and roofing: the same brick, siding profile or shingle color can be hard to find, and old shingles have faded. Ask how the pro will match them, and whether re-roofing one side or the whole house gives a better match.
  • Inside: floor heights, ceiling heights, trim and windows should line up with the existing rooms, so the addition feels like it was always there.

Heating, cooling, electrical and plumbing

  • Heating and cooling: your current system may not handle the extra space. A load calculation shows whether to extend the ducts, upgrade the system, or add a separate unit, such as a ductless mini-split, for the new rooms.
  • Electrical: new rooms need circuits, outlets, lighting and smoke alarms. An older panel may not have the room or capacity, so a panel upgrade may be part of the job.
  • Plumbing: a new bathroom or kitchenette needs drain, vent and water lines tied into the house, and your water heater has to keep up.
  • Insulation and windows need to meet your local energy rules.

Timeline and living through it

Every addition moves through the same phases, and permits often take longer than people expect:

  1. Planning, design and engineering
  2. Permits and any HOA approval
  3. Site work and the foundation
  4. Framing, roof, windows and doors, so the addition is closed in
  5. Rough plumbing, electrical, heating and cooling, then inspections
  6. Insulation and drywall
  7. Flooring, cabinets, trim, paint and fixtures
  8. Final inspection and a punch list of small fixes

Expect noise, dust and people coming and going. Ask how the crew will seal off the work area, which entrance they will use, where materials and the trash bin will sit, and when the wall to the house will be opened. With a second story, many families move out for part of the job.

What an addition bid should list

  • The scope, tied to the drawings, and who provides the plans and engineering
  • Permits and inspections, and who pulls them
  • The foundation type, framing, roofing, siding, windows and doors, with materials named
  • Heating and cooling, electrical, panel and plumbing work
  • Insulation, drywall and finishes; if some items are allowances to choose later, what each allowance covers
  • Protection of the rest of the house, daily cleanup and haul-away
  • The start date, the phases and how long each one takes
  • A payment schedule tied to finished stages, a written change order process, and the workmanship warranty in writing

Ask for lien waivers from the contractor and major suppliers as you pay, to protect your home from claims over unpaid bills. To line bids up fairly, see how to compare remodeling estimates.

Check insurance, licenses and experience

An addition is structural work on your home, so choose an experienced pro and check them yourself before you sign:

  • Ask for proof of liability insurance and workers' compensation insurance, and call the insurance company to confirm it is current.
  • Find out which licenses your city or state requires for this work, and check them with the agency that issues them.
  • Ask for photos and references from additions like yours, and call those references.
  • Ask who will run the job day to day, and which trades will be handled by other companies.

For more questions to ask home addition contractors, read how to choose a contractor.

Get home addition bids on BidHandyman

Describe the space you need, add photos of where it would go and any drawings you have, choose your timing, and post it free. Verified local pros bid on your room addition, bump-out or second story, and you compare the bids, check each pro's profile and reviews, message them and hire the one you like, with no obligation. Post your home addition.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What types of home additions are there?

The main types are bump-outs, ground-floor room additions, second story additions, garage conversions, sunrooms and in-law suites. The right one depends on your lot, your setbacks and what you need the space for.

Do I need a permit for a room addition?

Almost always. Additions usually need a building permit and inspections, and zoning rules such as setbacks apply. Check with your city or county before you settle on plans.

Do I need an architect for building an addition?

You need drawings, and many projects use an architect or a home designer plus an engineer for the structure. Some areas require plans stamped by a licensed professional, so check locally.

Is a bump-out addition easier than a full room addition?

It is usually smaller and less disruptive, since it extends one room. It still needs permits, proper support underneath and a good roof tie-in.

Can my house handle a second story addition?

Only an engineer can say. They check whether the foundation and walls can carry the extra weight and what reinforcement would be needed.

How do I choose between home addition contractors?

Compare bids on the same drawings, look at photos and references from similar additions, ask for proof of insurance and any license your area requires and check it, and get the payment schedule and warranty in writing.