Hire a renovation project manager: someone to plan and run your remodel for you

Not sure what your project needs, or no time to manage it? Hand it to someone who has run jobs like yours.

  • Free to post
  • Only verified pros bid
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

You want the remodel done, but you do not know what it really needs, in what order, or who to call first. Or you know exactly what you want and simply have no time to run it. You do not need to hire an engineer full time or become a builder for six months. A renovation project manager plans the job with you, lines up the right pros, keeps the schedule moving and checks the work, from the first idea to the final walk-through.

Who hires a renovation project manager

  • You are not sure what your bathroom, kitchen or addition should include, or what to ask for
  • Several trades are involved and you do not know the right order
  • You work long hours, travel, or the house is far from you
  • You want a clear plan and budget in writing before anyone starts
  • You have bids that do not match and you want an expert to compare them

What a renovation project manager does

StageWhat they handle
PlanWalk the house with you, turn your wishes into a written scope, flag what is easy to miss, set a realistic budget range and schedule
HireGet bids from the right pros, compare them line by line, help you choose
PreparePermits, materials ordered on time, a schedule every trade agrees to
Run the jobBring each trade in the right order, answer questions, handle changes in writing, send you updates and photos
FinishFinal walk-through, punch list, paperwork and warranties in one place

Project manager, general contractor, supervisor or architect?

  • Renovation project manager: plans and runs the whole project for you, and can work with a general contractor or with separate trades.
  • General contractor: builds the job with their own crew and subcontractors. Many also manage the project, so ask what is included.
  • Project supervisor: checks the work at key stages for you while someone else runs the job. See hiring a project supervisor.
  • Architect or designer: designs the space and draws the plans. Some also follow the build, most do not run it day to day.

The order a remodel usually runs in

  1. Scope and budget: what you want, what the house needs, and a budget range with room for surprises.
  2. Design and choices: layout, fixtures, finishes and materials picked before work starts.
  3. Permits: pulled before the first wall comes down.
  4. Demolition: and a check of anything hidden behind walls or under floors.
  5. Rough-in: framing, plumbing, wiring and ducts, then the rough-in inspections.
  6. Close the walls: insulation and drywall, only after the inspections pass.
  7. Finishes: waterproofing, tile, cabinets, counters, paint, flooring.
  8. Fixtures and trim: lights, faucets, hardware and appliances.
  9. Final walk-through: punch list finished before the final payment.
Tip: Most delays come from choices made late: a tile that is back-ordered or a vanity that does not fit. A good project manager has every choice made and ordered before demolition day.

Signs you would benefit from one

  • You have asked three pros and got three very different answers
  • You cannot be home to let trades in or answer questions during the day
  • The project touches plumbing, electrical and structure at the same time
  • You want one person to call instead of five

What to put in your post

  • The project: bathroom, kitchen, addition, whole house, repairs after a storm
  • Where it is now: just an idea, plans drawn, bids in hand, or already started
  • What you want help with: planning only, hiring the trades, running the whole job, or stage checks
  • Whether you can be on site, or need photo updates
  • Your timing and any plans, photos or bids you already have

Questions to ask a renovation project manager

  • What projects like mine have you run, and can I see photos?
  • Do you work with my contractor, or bring your own trades?
  • How do you send updates, and how often?
  • How do you handle changes and surprises once work starts?
  • How do you charge, and what exactly is included?
  • Do you carry insurance, and any license my area requires?

Get renovation project manager bids on BidHandyman

Tell us about your project and what you want help with. Local pros who have run jobs like yours can send you bids, and only pros approved by BidHandyman can bid. Compare them, message the pros and hire the one you trust, with no obligation. Request a project manager, or read whole house remodel and do I need a general contractor.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What does a renovation project manager do?

A renovation project manager runs your remodel for you. They help you decide what the project needs, put the scope and budget in writing, line up the right pros, set the order of the work, keep the schedule moving, check the work at each stage and walk the final punch list with you.

Is a project manager the same as a general contractor?

Not always. A general contractor builds the job with their own crew and subcontractors. A project manager plans and coordinates it, and can work with a general contractor or with separate trades you hire. Many experienced builders and remodelers do both, so ask how they work.

Do I need a project manager for a bathroom or kitchen remodel?

Not for every job. It helps most when you are not sure what the project needs, when several trades are involved, when you cannot be on site, or when the budget matters and you want every step planned before work starts.

Is it cheaper than hiring an engineer full time?

For a home project, almost always. You bring in a project manager for the length of the job or for the stages you need, instead of hiring anyone full time. Ask each pro how they charge so you can compare bids fairly.

Can a project manager hire the trades for me?

Yes. Many will get bids from plumbers, electricians, tile setters and other trades, help you choose, and set the schedule so each one comes in the right order.

What if I already have a contractor?

A project manager can still help: review the plan and contract, check the work at key stages and keep notes for both of you. If you mostly need checks, see our guide to hiring a project supervisor.

Can they manage a project I cannot visit?

Yes. Landlords, people who travel and families helping an older parent often have the project manager visit, take photos and send updates.