Bathroom remodel steps: what comes first, in the right order

Tile first or the vanity first? Do it out of order and you pay for some of it twice. Here is the order pros follow.

  • Free to post
  • Only verified pros bid?
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

A bathroom remodel is a lot of trades in a small room: demolition, plumbing, electrical, walls, waterproofing, tile, paint and fixtures. Done in the right order, each step sets up the next. Done out of order, something gets torn out and redone. Here is the order most pros follow, and the decisions to make before the first tile comes off the wall.

The steps in order

StepWhat happens
1. Plan and chooseLayout, tile, vanity, fixtures, lighting and paint picked and ordered
2. PermitsPulled before work starts if plumbing, wiring or walls change
3. DemolitionOld tile, fixtures and drywall out; anything hidden is checked
4. Rough-inNew pipes, drains, wiring, fan and blocking for grab bars or a heavy vanity
5. InspectionRough-in checked before anything is closed up
6. Walls and floor prepCement board or drywall, a level floor, the shower base
7. WaterproofingMembrane in the shower and wet areas, tested before tile
8. TileFloor and walls, then grout and sealing
9. PaintCeiling and walls before fixtures go on
10. Fixtures and finishVanity, toilet, faucets, glass, lights, mirror and accessories
11. Final walk-throughPunch list finished before the final payment
Tip: Have every fixture and the tile on site, or at least confirmed in stock, before demolition day. A single back-ordered faucet can leave a gutted bathroom waiting for weeks.

The mistakes that cost twice

  • Choosing the vanity or shower valve after the plumbing is roughed in, so pipes move again
  • Closing walls before the inspection, so they have to be opened up
  • Skipping or rushing waterproofing in the shower; it is hidden once the tile is on
  • Painting after the vanity and mirror are in, so everything has to be masked or moved
  • No blocking in the wall for grab bars or a heavy mirror

How long each part usually takes

A simple update (new vanity, toilet, paint and fixtures) can take days. A full remodel with new tile and plumbing usually takes a few weeks, longer if walls move or items are back-ordered. Ask each pro for a written schedule that lists the steps above.

What to put in your post

  • Full remodel or specific parts: shower, tub, tile, vanity, toilet
  • Whether anything moves: the toilet, the shower, the sink
  • Photos of the bathroom now and any ideas you like
  • Whether you have already chosen tile and fixtures
  • Your timing, and whether this is your only bathroom

Get bathroom remodel bids on BidHandyman

Post your bathroom once and local pros send you bids. Only pros approved by BidHandyman can bid. Compare them, ask each one for their step-by-step schedule, message the pros and hire the one you trust, with no obligation. Request bathroom bids, or read bathroom remodel bids and hiring a renovation project manager.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What is the right order for a bathroom remodel?

Plan and choose everything, get permits, demolish, rough in the plumbing and wiring, pass the inspection, close and prepare the walls, waterproof the shower and wet areas, tile, then paint and install the vanity, toilet, fixtures and accessories, and finish with a final walk-through.

Does tile or the vanity go in first?

Usually floor tile goes in first and the vanity sits on top of it, so the floor looks finished if you ever change the vanity. Wall tile behind a vanity depends on the design, so agree on it with your pro before work starts.

Why choose everything before demolition?

Fixtures and tile decide where pipes and outlets go. Choices made late mean changes behind walls, and a back-ordered item can stop the whole job while the bathroom sits unusable.

Do I need a permit?

Moving plumbing or wiring, changing walls or adding a fan or circuit usually needs one. Rules vary by city, so ask your pro and your local building office.

What is waterproofing and why does it matter?

Tile and grout are not waterproof on their own. A membrane under the tile in the shower and wet areas keeps water out of the walls and floor. It is one of the most important steps and it is hidden once the tile is on.

When should the inspection happen?

After the plumbing and wiring are roughed in and before the walls are closed. Once drywall and tile go up, nobody can see what is behind them.

Can I hire separate trades instead of one contractor?

Yes, but someone has to schedule them in the right order. Many owners hire one contractor or a project manager to run it.