Tub to Shower Conversion Upstairs: How Pros Do It Right on a Second Floor

Updated November 19, 2026 · 5 min read

Get free quotes from local pros

Turning a tub into a walk-in shower looks easy. Upstairs, it's engineering, because if it ever leaks, the ceiling below finds out first. A second-floor conversion touches the floor structure, the drain, the valve and the waterproofing, and each one has a right way to do it.

This guide follows the seven steps pros use, plus the design choices that make a shower look bigger and stay easy to clean. The short film above shows each layer as a 3D section, from the living room ceiling up to the finished shower.

Step 1: Read the Structure (Joists and Deflection)

Before anything is removed, a pro finds out what holds the floor up: which way the joists run, how deep they are (a 2×10 is about 9¼ inches) and how far apart (often 16 inches on center).

Tile needs a stiff floor. The tile industry's guide is a deflection limit of L/360 for ceramic and porcelain and L/720 for natural stone, where L is the joist span. A floor that bounces cracks tile and grout. If it's too flexible, the usual fix is to sister new joists beside the old ones or add blocking, before the shower goes in.

Step 2: Protect the Path, Then Demo

Upstairs work means everything travels through the house. A careful crew protects the whole path: entry floors, stairs, railings and the hallway.

An old cast-iron tub can weigh around 300 pounds. Pros often break it up in place, under a heavy cover with eye and ear protection, instead of fighting it down the stairs. Steel and acrylic tubs usually come out in one piece.

Step 3: The Drain (Size, Slope, Vent, Joists)

A tub drain is usually 1½ inches. Plumbing codes generally call for a 2-inch drain for a shower, because a shower can run longer with no tub to hold the water. The new line slopes about ¼ inch per foot and is vented.

On a second floor that drain often runs through the joists, and the code has strict rules for that (IRC R502.8):

  • Bored holes no larger than one third of the joist's depth.
  • Holes at least 2 inches from the top and bottom edges.
  • No notches in the middle third of the span.

When the drain can't follow those rules, a pro reroutes it or adds structure. A joist cut in the wrong place is the kind of problem that shows up years later.

Step 4: The Valve (Anti-Scald, Reachable, Blocking)

In a walk-in shower, the valve usually moves toward the entry so you can turn the water on without getting soaked. Shower valves must be anti-scald (pressure-balanced or thermostatic) under the plumbing code.

While the wall is open, pros add solid blocking for grab bars, even if you don't want grab bars yet. It costs almost nothing now and makes a safe, solid grab bar possible later.

Step 5: The Floor Slope, Curbless or a Low Curb

The shower floor slopes toward the drain, about ¼ inch per foot (codes allow ¼ to ½ inch).

Curbless showers look great, but on a second floor they mean recessing the floor so the slope fits below the bathroom floor level, without weakening the joists. That can take structural work. Often a low curb or a linear drain (a long, slim drain at one wall that lets the whole floor slope one way) is the smarter move, with nearly the same easy step-in.

Step 6: Waterproofing and the Flood Test

Waterproofing is the layer nobody sees and everybody depends on. Pros build one continuous membrane (a sheet or a liquid-applied product made for showers): across the floor, up the walls, banded into every inside corner, and sealed around every pipe and valve.

Then the flood test: plug the drain, fill the pan with water, mark the line, and wait a full day. If the line hasn't moved, it's sealed, and the tile can go on. On a second floor this is the step that protects the ceiling below.

Design Rules: Tile, Grout and Color

  • Big tiles on the walls mean fewer grout lines, easier cleaning and a room that looks bigger.
  • Small tiles on the floor follow the slope to the drain and grip better under wet feet. With a linear drain, larger floor tile can work because the floor slopes in one direction.
  • Mid-tone grout hides daily life better than bright white or very dark grout.
  • Keep the palette light and calm, and save your bold color for the niche or one accent band.

Step 7: Tile Like a Pro

In a shower, tile setters back-butter large tiles so the mortar fully covers the back. Industry standards call for about 95% coverage in wet areas, with no hollow spots for water to sit in.

  • Leveling clips keep large tile edges flush (no lippage).
  • The layout starts from the center, so the cuts at both sides match and no wall ends in a thin sliver.
  • The niche goes on an interior wall, with its sill sloped to drain.

Design Rules: Light, Glass and the Fan

  • Light: warm white around 3000 K, with a fixture rated for wet locations inside the shower.
  • Glass: frameless clear glass keeps the room open. Low-iron glass loses the green tint you see on the edge of standard glass.
  • Fan: vented to the outside, at least 50 cubic feet per minute for a bathroom (more for big rooms), ideally on a timer so it runs after the shower.

Hire a Shower Pro With Confidence

When you compare quotes for a tub to shower conversion upstairs, ask each pro how they check the joists, where the new drain will run, which waterproofing system they use and whether they flood test it, and how the valve will be placed. The best answers are specific and in writing.

On BidHandyman you post your project once, for free, and verified pros send their bids. You compare them and hire the pro you trust.

Common questions

Can you convert a tub to a shower on a second floor?

Yes. It is very common. The extra work upstairs is checking the floor structure, routing a 2-inch drain through or around the joists by the code rules, and waterproofing carefully, because a leak shows up in the ceiling below.

What size drain does a shower need?

Plumbing codes generally call for a 2-inch drain for a shower. Most tubs have a 1½-inch drain, so a conversion usually upsizes it, sloped about ¼ inch per foot and vented.

Can I drill through floor joists for a drain?

Within limits: bored holes no larger than one third of the joist depth and at least 2 inches from the top and bottom edges, and no notches in the middle third of the span (IRC R502.8). Your local code and building department have the final word.

Can I have a curbless shower upstairs?

Often yes, but it means recessing the floor without weakening the joists, which can take structural work. A low curb or a linear drain is often a simpler way to get an easy step-in.

How much slope does a shower floor need?

About ¼ inch per foot toward the drain. Codes allow ¼ to ½ inch per foot.

What is a shower flood test?

After waterproofing and before tile, the drain is plugged and the pan is filled with water, the level is marked, and it sits for about a day. If the water line has not dropped, the waterproofing holds.

What grout color is best for a shower floor?

A mid-tone grout hides everyday wear and soap residue better than bright white or very dark grout.

How big should a bathroom exhaust fan be?

At least 50 cubic feet per minute for a typical bathroom under the residential code, vented to the outside. Larger bathrooms need more.