Renovating an old house on a budget: where to start and how to do it in phases

A second home, a rental, an inherited house or your twentieth: when every room needs work and the budget is set, the order you spend it in decides how far it goes.

  • Free to post
  • Only verified pros bid
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

A second home you just bought, a rental, an inherited house, or one of twenty you own: an old house with a set budget always asks the same question. Where does the money go first? Spend it in the wrong order and the budget runs out with half the house done twice. Spend it in the right order and every phase protects the one before it.

This guide walks through how experienced contractors plan an old-house renovation on a budget: what to look for before you spend anything, how to split the money into phases you can pause between, what is worth keeping, how to stretch the budget without cutting corners, and how to hire for the whole plan.

The short answer: walk the house with a pro first, fix what keeps it safe and dry, update the systems while the walls are open, then kitchen and baths, finishes last. Keep a cushion for surprises, and get one plan for the whole house, priced phase by phase.

Know what kind of old house you have

The year a house was built tells you a lot about what is inside the walls. These are the things pros look for first, by age:

If the house was builtLook for
Before about 1950Knob-and-tube wiring, fuse boxes, plaster walls, cast iron or clay drain lines, little or no insulation
Before the 1960sGalvanized steel water pipes that rust inside and lose water pressure
Mid-1960s to mid-1970sAluminum branch wiring in some homes
Before 1978Lead-based paint under newer layers
Before the 1980sAsbestos in some floor tiles, pipe insulation, siding and textured ceilings
About 1978 to 1995Gray polybutylene water pipes in some homes

None of these means the house is a bad buy. They are simply the most common budget items in older homes, and knowing about them up front is what keeps a budget honest.

1. Walk it with a pro before you spend anything

Old houses keep their biggest problems out of sight. Before you choose a single finish, walk the whole house with an experienced contractor or home inspector and look at:

  • The roof, the attic and any signs of old leaks
  • The foundation, the crawl space or basement, and how water drains away from the house
  • The electrical panel and the wiring
  • Plumbing: supply pipes, drain lines and the water heater
  • Heating and cooling: age, ducts and how evenly the house heats and cools
  • Windows, doors, wood rot and signs of pests

Bring in specialists where the walk-through points: an electrician for old wiring, a plumber for old pipes, a roofer, or a structural engineer if floors slope or the foundation has cracks.

Tip: In an old house, ask a plumber to run a camera through the main sewer line. Old clay or cast iron lines can crack or fill with roots, and it is much cheaper to find that before the new floors go in.

2. Make three lists: fix now, fix soon, nice to have

Ask your pro to sort everything they find into three lists. That sorting is the heart of a renovation budget.

ListWhat goes on itExamples
Fix nowSafety, water and anything getting worseRoof leaks, unsafe wiring, active plumbing leaks, foundation drainage
Fix soonSystems at the end of their lifeOld water heater, aging heating and cooling, galvanized pipes, drafty attic
Nice to haveComfort and looksNew kitchen layout, tile, new flooring, built-ins, paint colors

3. Split the budget into phases

Pros spend an old-house budget from the inside of the problem out: safety and water first, beauty last. Each phase protects the one before it, and some phases are natural places to pause and save.

PhaseWhat goes in itGood place to pause after?
0. Plan and permitsWalk-through, the three lists, the whole-house plan, permitsYes
1. Safe and dryRoof, leaks, foundation, drainage, unsafe wiringYes: the house is protected
2. SystemsPlumbing, electrical, heating and cooling, while the walls are openAfter inspections pass
3. Walls and insulationInsulation, drywall or plaster repairYes: the house is closed up again
4. Kitchen and bathsCabinets, counters, tile, fixturesBetween rooms
5. FinishesFlooring, trim, paint, lighting, curb appealRoom by room

Keep a cushion for what is behind the walls. Many pros suggest 10 to 20 percent of the budget, and more in a very old house. If the cushion is not used, it moves to the next phase.

4. Hire for the whole plan, not just phase one

The best results come from one written plan for the whole house, priced phase by phase. Then you can finish a phase, pause, save, and pick up right where you left off, without tearing out finished work to start the next one.

  • Give every pro the same list, so the bids line up
  • Ask for a price for each phase, not one total
  • Ask what can safely wait between phases, and what cannot
  • Ask who runs the schedule: a general contractor or a project manager
  • Ask who pulls the permits and books the inspections
  • Ask for photos of similar old-house jobs they have done
  • Tie payments to finished stages in writing, and approve changes in writing before they are done

Many owners hire one general contractor for the whole plan. Others hire trades phase by phase and bring in a renovation project manager to keep it all in order. Either works when there is one written plan.

5. During each phase

  • Walk the house every week with your pro
  • Photograph every wall before it is closed: those photos show where pipes and wires run for as long as you own the house
  • Protect finished work: floors covered, dust walls up
  • Pay as each stage is done, not ahead of the work
  • Finish each phase with a punch list
  • Keep a running list for the next phase, and plan it with what you learned

How to stretch the budget without cutting corners

  • Keep the layout. Moving walls, plumbing and the kitchen is where budgets grow fastest. Updating rooms where they are stretches the money furthest.
  • Refinish instead of replace. Old hardwood floors, solid doors, trim and cast iron tubs can often be refinished.
  • Paint or reface solid cabinets. If the boxes are sound, new doors or paint can be enough.
  • Group the same work. All the plumbing at once, all the electrical at once, so each trade comes once per phase.
  • Decide finishes early. Late changes are the most expensive kind.
  • Seal and insulate. Attic insulation and air sealing make an old house more comfortable and cheaper to run.
  • Do safe work yourself. Painting, cleanup and yard work, but leave demolition to pros in houses that may have lead paint or asbestos.

What is worth keeping in an old house

Usually worth keepingUsually worth replacing
Hardwood floorsKnob-and-tube wiring and fuse panels
Solid wood doors, trim and built-insGalvanized water pipes
Plaster walls in good shapeFailing drain and sewer lines
Cast iron tubs and sinksHeating and cooling at the end of its life
Original windows that can be restoredWindows that are rotted or will not seal

Permits, codes and lead-safe work

Electrical, plumbing, heating and cooling, structural changes and additions usually need permits, and renovated areas often have to meet today's code, such as outlets protected near water and working smoke and carbon monoxide alarms. In homes built before 1978, contractors who disturb painted surfaces generally need to follow lead-safe work practices, and suspected asbestos should be tested before it is disturbed. If the house is in a historic district, ask the city what needs approval before you change the outside.

Living in it, renting it, or a second home far away

  • Living in it: phase the work so one bathroom and a place to cook stay usable, and plan to be away for the dustiest days.
  • A second home far away: one person runs the project, weekly photo or video updates, a lockbox or smart lock, and a local contact for deliveries and inspections.
  • A rental: plan the phases between tenants, and choose durable finishes that are easy to repair.

One house, two or twenty

If you own more than one house, the same rules apply, and they get easier with each house. The trick is a spec sheet: the same choices everywhere.

On the spec sheetWhy it helps
Paint colors and sheenTouch-ups match in every house
FlooringBuy more at once, keep spare boxes for repairs
Cabinets and countersFaster bids and ordering
Faucets, fixtures and hardwareOne set of spare parts
LightingSame bulbs and fixtures to replace
  • Send the same list to every pro, so bids come back faster and line up
  • Keep the crews that did good work; each house after the first goes quicker
  • Track every house on one sheet: which phase it is in and what is next
  • For rentals, plan the phases around move-outs so a house is never empty longer than it needs to be

Paying for it

Many owners pay phase by phase from savings, which is exactly what a phased plan is for. Others use a home equity line, a cash-out refinance, or a renovation loan that rolls the work into a mortgage, and investors often use short-term rehab loans. Talk with your lender before you start, because some loans release money in stages and need the contractor's bid and schedule.

Habits that cost old-house budgets the most

  • Starting with the kitchen before the roof and the wiring are done
  • Finishing a room, then opening its walls for the next phase
  • No cushion for what is behind the walls
  • A different contractor for every phase without one written plan
  • Changing finishes in the middle of a phase
  • Skipping permits, which can slow a sale or an insurance claim later
  • Closing walls without photos

What to expect

Expect at least one surprise behind a wall, a few weeks between phases while you save or order, and some dust. Each finished phase makes the next one easier, and from the first phase on, the house is safe and dry.

Get old house renovation bids on BidHandyman

Post your house once with photos and your phase list, and local pros send you bids. Only pros approved by BidHandyman can bid. Compare their plans and prices by phase side by side, message the pros and hire the one you trust, with no obligation. Request renovation bids, or read whole house renovation tips, hiring a renovation project manager and do I need a general contractor.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

Where do I start renovating an old house on a budget?

Start with a walk-through by a pro to find the big problems first: roof, foundation, wiring, plumbing, heating and cooling. Then split the budget into phases: safe and dry first, then the systems, then walls, kitchen and baths, finishes last, with a cushion for surprises.

What should I renovate first in an old house?

Anything that keeps the house safe and dry: the roof, leaks, foundation and drainage, and old or unsafe wiring and plumbing. Finishes like paint, flooring and trim go last so later work does not damage them.

How much should I set aside for surprises?

Many pros suggest keeping 10 to 20 percent of the budget aside, and more in an older house where the wiring, plumbing or framing has not been opened in years.

Can I renovate one phase at a time?

Yes. Ask each pro for a written plan for the whole house and a price by phase, so you can finish one phase, pause, save, and start the next without redoing work. The safest places to pause are after the house is dry and after the walls are closed.

What are the most common old-house problems?

Old wiring and fuse panels, galvanized water pipes, aging drain and sewer lines, roof leaks, foundation settling, little or no insulation, and older materials like lead paint or asbestos that need careful handling.

Is it worth renovating an old house instead of tearing it down?

Often, yes, when the foundation and framing are sound. Old houses frequently have solid wood, good bones and character that is hard to rebuild. A structural check by a pro tells you whether the bones are worth the budget.

Do I need permits to renovate an old house?

Usually for electrical, plumbing, heating and cooling, structural work and additions; paint and cosmetic work often do not. Rules are local, so ask your building office or have your contractor pull the permits.

I own more than one house. How do I keep the budget under control?

Use the same list and the same finishes for every house: paint colors, flooring, fixtures, cabinets and hardware. Pros can price and order faster, repairs later are simpler, and every house after the first goes quicker.

How do I renovate a second home I do not live near?

Hire one person to run the project, such as a general contractor or project manager, agree on weekly photo or video updates, use a lockbox or smart lock for access, and keep a local contact for deliveries and inspections.

Can I live in the house while it is renovated?

Often, if each phase keeps a bathroom and a place to sleep usable. For the dustiest phases, like demolition, sanding and floor finishing, many owners stay somewhere else for a few days or weeks.