Kitchen remodel tips: decide these 4 things before you pick a cabinet

Cabinets and counters are the fun part. These four decisions make the kitchen work every day, and they are hard to change later.

  • Free to post
  • Only verified pros bid
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

A kitchen remodel starts with cabinet doors and countertop samples, but the kitchens people love to cook in are decided earlier, by four choices that are hard to change once the work starts. Make these first, and every bid you get will be easier to compare.

1. The work triangle

Sink, stove and fridge are the three places you move between the most. Keep them a few steps apart, close enough to turn from one to the next, and keep the main walkway out of the triangle so nobody walks through the cook's path.

  • Counter space on both sides of the stove and next to the fridge
  • The dishwasher next to the sink
  • Room for two people if more than one person cooks

2. Outlets and lights before the walls close

Wires run inside the walls and the ceiling. Decide where you want outlets, under-cabinet lights, pendants over an island and switches before drywall and backsplash go up. Under-cabinet lighting is the change most people say they wish they had planned.

Tip: Walk through how you use the kitchen: where the coffee maker lives, where you charge a phone, where you chop. Each spot needs an outlet and light.

3. Give every remodeler the same list

Bids are only comparable when they price the same job. Write one list and send it to everyone:

On the listSay
CabinetsReplace, reface or paint; how many; any island
CountertopsThe material you want, or ask for options
BacksplashWhere it goes and the tile, if chosen
AppliancesWho buys them and who installs them
Plumbing and electricalAnything that moves; new outlets and lights
Flooring and paintIncluded or not

Then compare what each bid includes, the schedule and the warranty, not just the total.

4. Countertops come after the cabinets

Countertops are measured after the base cabinets are in and level, then cut to fit. That gap is normal, and it is the part people forget to plan for. Set up a temporary kitchen in another room: the fridge, a microwave, a coffee maker, a small table and a bin for dishes.

What to expect during the remodel

  1. Final design and ordering of cabinets, counters and appliances
  2. Demolition and any wall changes
  3. Plumbing and electrical rough-in, then inspection
  4. Drywall, paint and flooring
  5. Cabinets, then the countertop measure and install
  6. Backsplash, sink, faucet, appliances and lighting
  7. Final walk-through and punch list

Get kitchen remodel bids on BidHandyman

Post your kitchen once with your list and photos, and local remodelers send you bids. Only pros approved by BidHandyman can bid. Compare them side by side, message the pros and hire the one you trust, with no obligation. Request kitchen bids, or read kitchen remodel bids and kitchen and bathroom remodels.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What should I decide first in a kitchen remodel?

Decide the layout and work triangle, where outlets and lighting go before the walls close, a single written list of what you want so every remodeler bids on the same thing, and how you will cook while the kitchen is out of use.

What is the kitchen work triangle?

The path between the sink, the stove and the fridge. Each should be a few steps from the others, with a clear path between them and no walkway cutting through the triangle.

Why plan lighting and outlets early?

Wires run inside the walls and above the ceiling. Once drywall, cabinets and backsplash go up, adding an outlet or under-cabinet lights means opening finished work.

How do I compare kitchen remodel bids?

Give every remodeler the same written list: cabinets, countertops, backsplash, appliances, plumbing and electrical, flooring, paint. Then compare what each bid includes, the schedule and the warranty, not just the total.

When are countertops measured?

After the base cabinets are installed and level. The countertop is cut to the real cabinets, so there is a gap of days to weeks between cabinets and counters.

How do I live without a kitchen during a remodel?

Set up a small temporary kitchen in another room: the fridge, a microwave, a coffee maker, a table, and a bin for dishes you wash elsewhere.