The best time to remodel: plan in fall, build in winter, enjoy it by spring

The dream kitchen, the primary bath, the wall you want gone. If your remodel keeps waiting for "next year", here is the timing that gets it done.

  • Free to post
  • Only verified pros bid?
  • No obligation
Related requests

How it works

  1. 1
    Post your job free

    Tell us what needs doing. Add photos and a budget if you like.

  2. 2
    Verified pros bid

    Only pros we approve can send you a price.

  3. 3
    Compare and hire

    Message pros, compare bids and pick the one you like.

Some of the nicest houses are "haunted" by a remodel: the dream kitchen that lives on a phone full of photos, the primary bathroom that still looks like the year the house was built, the wall that should have come down years ago. The remodel isn't stuck because of money or taste. It's stuck because there never seems to be a right time. Here is how remodelers think about timing, season by season, so the project that keeps waiting for next year can start this one.

The short answer

Plan in fall, build in winter, enjoy it by spring. Indoor remodels (kitchens, bathrooms, basements, opening up walls) don't depend on the weather, and many contractors have more room in their schedules after the busy season. Outdoor projects and additions are usually planned over the winter and built in spring or early summer.

The best time to remodel, by project

ProjectPlanBuildWhy
KitchenLate summer to fallLate fall to winterIndoor work; cabinets and counters can take weeks to arrive, so order early
Primary bathroomFallWinterIndoor work; plan around guests if it is the only full bath
Opening a wall (open concept)FallWinterIndoor work; the beam and the permit need time, so start early
Whole-house remodelSummer to fallFall through springLong project; design, permits and ordering take months
Addition or exteriorWinterSpring to summerFoundations, framing and roofing need dry, mild weather
BasementAny timeFall to winterIndoor work; check for moisture after the wet season

Why fall is the time to plan

  • Contractors' calendars open up. Spring and summer are busy with outdoor work. Many remodelers look for indoor projects to fill late fall and winter.
  • Lead times are real. Custom cabinets, special-order tile, windows and some fixtures can take weeks. Choosing them in fall keeps a winter start on schedule.
  • Permits and design take time. Plans, engineering for a beam and permit reviews are easier to finish before the holidays.
  • The finish line is spring. Start in winter and the new kitchen is ready for spring guests, graduations and summer.

The dream remodels people put off most

The dream kitchen

Decide the layout first (where the sink, range and fridge go), then the island, storage and lighting, then the finishes. Moving plumbing or gas is what changes the scope most. Ask every remodeler to price the same plan so the bids compare.

The primary bathroom

The upgrades people love most are a larger walk-in shower, a freestanding tub where it fits, double sinks, better lighting and a fan that actually clears the steam. Waterproofing behind the tile is where good work shows; ask what each contractor uses.

The wall you want gone

Before you design an open kitchen and living room, find out if the wall is load-bearing and what runs inside it. Most walls can go, some need a beam, and a few hide plumbing or ducts that move the plan. One visit from a pro answers this.

The whole-house remodel

Doing several rooms at once means one design, one schedule and one cleanup. A whole-house remodel usually starts with the work behind the walls (electrical, plumbing, insulation), then walls and ceilings, then floors, cabinets and finishes. Read the order that saves you on a whole-house renovation.

How long a remodel takes, step by step

StepWhat happensTypical time
Ideas and wish listPhotos, must-haves, what bothers you nowA few weeks
Design and selectionsLayout, cabinets, tile, fixturesA few weeks to a few months
BidsTwo or three remodelers price the same scopeTwo to four weeks
Permits and orderingPermit review where required; long-lead items orderedVaries by city and products
ConstructionDemolition to final touchesWeeks for a bath, one to three months for a full kitchen, longer for a whole house
Final walk-throughPunch list, inspection, warranty papersA day or two

Planning around the holidays

  • Ask your contractor which days the crew is off, and when deliveries can't come
  • If guests are coming, plan a temporary kitchen corner (microwave, coffee, fridge) or finish the bathroom first
  • Agree on dust walls, daily cleanup and which entrance the crew uses
  • Keep choices made before demolition starts; changes mid-project are what push dates

How to choose the remodeler

  • Two or three written bids for the same scope, compared line by line
  • Photos of similar projects and reviews from your area
  • Proof of insurance, and a license where your state requires one
  • A written schedule and a payment plan tied to finished stages
  • Who runs the job day to day, and how you'll get updates

Read four kitchen decisions to make first and what an expert checks before a bathroom remodel.

Get remodel bids on BidHandyman

Post your remodel once, free, with photos of the room and the ideas you love, and local remodelers send you bids. Only pros approved by BidHandyman can bid. Compare them side by side, message the pros and hire the one you trust, with no obligation. Request kitchen remodel bids or bathroom remodel bids.

Questions

Is it free to post a job?

Yes. Posting a job on BidHandyman is free for homeowners, and there is no obligation to hire anyone.

Who can bid on my job?

Only pros approved by BidHandyman can send bids. Each pro has a profile you can check before you hire.

How do I choose a pro?

Compare the bids side by side, message the pros with any questions, and hire the one you like.

What is the best time of year to remodel a house?

For indoor projects like kitchens and bathrooms, plan in late summer or fall and build in late fall or winter, when many contractors have more room in their schedules for indoor work. Exterior work and additions are usually best planned over the winter and built in spring or early summer.

Is winter a good time to remodel?

For indoor work, often yes. Kitchens, bathrooms, basements and interior walls don't depend on the weather, and many remodelers have more openings after the busy spring and summer season. Plan around the holidays, deliveries and any work that needs open doors or outside access.

When should I start planning a kitchen remodel?

Several months before you want work to start. Design, choosing cabinets and counters, bids and permits all take time, and some cabinets and fixtures have long lead times. Many homeowners plan in fall for a winter start and a finished kitchen by spring.

How long does a kitchen or bathroom remodel take?

It depends on the size and how much changes. A bathroom refresh can take a couple of weeks; a full kitchen or a primary bath with new plumbing and layout often takes one to three months of work, plus the planning and ordering before it. Ask each contractor for a written schedule.

Can I remove a wall to open up my kitchen?

Often, but first find out whether the wall is load-bearing and what runs inside it (pipes, wires, ducts). A load-bearing wall can usually still go, with a beam sized by a pro and a permit where your city requires one. Get that answer before you design around it.

Should I remodel everything at once or in phases?

Doing it at once means one mess and one schedule; phases spread out the cost and the disruption. Rooms that share plumbing, walls or flooring (kitchen and the room next to it, or two bathrooms) are often cheaper and easier to do together.

Can I live in the house during a remodel?

Usually, with planning: a temporary kitchen corner, a second bathroom, dust walls and a clear daily schedule with your contractor. Whole-house remodels or work on the only bathroom may be easier with a short stay elsewhere.

How many bids should I get for a remodel?

Two or three, for the same written scope, so you can compare them line by line: what is included, the schedule, the payment plan and the warranty.